JAM Floor ScreedingCall 086 838 2613
JAM Floor Screeding

Floor Screeding for House Extensions

Fast dry screed for extensions, ready to tile in 3 to 4 days. Laser-levelled to meet the floor in the rest of the house, so the tiler isn't left waiting and you get your house back sooner.

  • ★★★★★ 5.0 on Google
  • 20+ years
  • Fully insured
Extension floor screeded and laser-levelled by JAM Floor Screeding

Ready to tile in 3 to 4 days

A traditional sand and cement screed needs weeks to dry before tiles can go down. On an extension that holds everything up: the tiler, the kitchen fitter and getting your house back.

Fast dry screed is laid the same way, pumped in and laser-levelled, but the mix dries far quicker. You can walk on it the next day and it's ready to tile in 3 to 4 days.

Extensions we screed

  • Kitchen and living room extensions
  • Single-storey rear and side extensions
  • Sunrooms and small one-room extensions
  • Garage conversions
  • Extensions with underfloor heating

Level with the rest of the house

The new floor has to finish at the same height as the floor in the house, or you're left with a step at the doorway. We laser-level the screed to your finished floor height, allowing for the tiles or timber going on top, so the old and new rooms meet flush.

Over insulation and underfloor heating

Most extension floors go down over insulation, and plenty have underfloor heating pipes. Fast dry screed goes over both, the same as a standard screed. Tell us at the site visit and we'll set the depth to suit. More on screed depth over underfloor heating.

Small extensions are no problem

Whether it's a single room off the kitchen or a full-width extension, send the rough size in square metres and we'll come back with a site visit and a price.

Where we screed extensions

Based in Portlaoise, we screed house extensions across Leinster:

How it works

Three steps to a level floor

  1. Tell us about the jobRing, WhatsApp or send the form: where it is, roughly how many square metres, and when the tiler is booked in.
  2. Site visit and priceWe call out, look at the floor, measure up and give you a clear price and the right screed for the job.
  3. Approve and we pourOnce you're happy with the price we book the date, arrive with the pump and lay the floor level.
Reviews

Rated 5.0 on Google

What customers say after the floor goes down.

★★★★★
"Brilliant job completed by James and his crew. Very proactive in organising the work, materials and agreeing a date. The lads came when they said they would and the finish is top quality. Highly recommend"
Evin Galvin, Google review
★★★★★
"JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!"
David O'Keeffe, Google review

Read all our Google reviews

Questions we get asked

How soon can the extension floor be tiled?

Fast dry screed is ready to tile in 3 to 4 days, and you can walk on it the next day. Exact times depend on depth and site conditions, and we'll give you a date at the site visit.

Will the new floor be level with the rest of the house?

Yes. We laser-level the screed to your finished floor height, allowing for the tiles or timber going on top, so there's no step between the house and the extension.

Do you screed small extensions?

Yes. Single-room extensions, sunrooms and garage conversions are all fine. Send the rough size in square metres and we'll price it.

Does fast dry screed cost more than standard screed?

The material costs a bit more than standard screed, but it often saves money by keeping the rest of the job on schedule. We can price both so you can choose.

Can it go over underfloor heating?

Yes, fast dry screed goes over underfloor heating pipes and insulation.

Free quote

Tell us about your extension

Send the details and we'll come back to you with a site visit and a price. The form opens WhatsApp with your message ready to send.

  • Site visit before we price
  • Clear price agreed before we start
  • Laser-levelled finish

Rather talk? Ring 086 838 2613 or email info@jamfloorscreeding.com.

No obligation. We only use your details to reply to you.

Get a free quote for your extension floor

Call 086 838 2613WhatsApp James
Call nowWhatsApp